Skip to content Skip to sidebar Skip to footer

Heavy-Duty Steel, Fully Refreshed

Heavy-Duty Steel, Fully Refreshed

This heavy-duty steel framework came to us raw and uncoated — and left our spray booth fully protected and looking sharp in a custom green 2K polyurethane finish. Swipe through the transformation: from bare metal, to primer, to the final durable topcoat.

 

Step 1: Surface Preparation

We started by thoroughly prepping the steel, removing any contaminants and ensuring a clean surface for maximum adhesion. Proper prep work is key to a long-lasting finish.

Step 2: Primer Application


A strong, corrosion-resistant primer was applied to give the steel long-term protection. This not only seals the surface but provides a solid base for the topcoat to bond to.

Step 3: Final Topcoat in Custom Green


The job was finished with a 2K polyurethane topcoat in a bold custom green. This coating offers excellent durability, chemical resistance, and a clean, professional appearance — ideal for industrial environments.

Specialists in Industrial Finishing
Whether you’re restoring machinery or coating new fabrications, we offer tailored solutions for protective and decorative finishes.

📞 Get in touch today to discuss your next project — from preparation to final coat, we’ve got you covered.

Leave a comment